ROAD CONSTRUCTION NOTICE
Week of December 4, 2023
(UPDATE 12/6/2023)
Please see below for road construction notices in process and upcoming.
Should you wish to report a pothole, please use our convenient, on-line POTHOLE PORTAL
Recycling Notice: Occasionally, a road closure will prevent a scheduled recycling collection. Should this occur, please email
Mayor Hornik announces $35mm 7-year road construction plan as an extension of his existing $10mm road repair initiative. MORE…
ROAD TO REMAIN OPEN – CONSTRUCTION ADVISORY – POLICE PRESENT
All construction from 7am until 5pm unless stated otherwise
Sandburg Drive - Monday (12/4) through Friday (12/8), construction crews will be working on Sandburg Drive and the adjoining cul de sacs performing drainage improvements, as directed as well as the replacement of select sections of concrete curb and the reconstruction of all handicap ramps between Wylie Terrace and NJSH Route 9.
Topanemus Road - Wednesday (12/6) through Friday (12/8), construction crews will be working on Topanemus Road performing concrete curb replacement between Julian Way and the bend just east of Colts Brook Road.
Hastings Road - Monday (12/4), construction crews will be performing roadway milling and on Thursday (12/7) will perform paving operations.
Crine Road– Monday (12/4) and Tuesday (12/5) construction crews will be performing roadway milling and on Thursday (12/7) and Friday (12/8) will perform paving operations on Crine Road between Station Road and Condor Drive.
Erin Drive and Eric Court - Tuesday (12/5) through Wednesday (12/6), construction crews will be performing roadway milling and on Friday (12/8) and Monday 12/11 will perform paving operations on Evan Drive and Eric Court.
Menzel Lane - Friday (12/8), construction crews will be performing roadway milling and paving operations on Menzel Lane between Tennent Road and the Marlboro Board of Education right of way at Robertsville Elementary School.
LLOYD ROAD WATER MAIN REPLACEMENT PROJECT
Approximately 1,300 feet of existing water main on Lloyd Road between Route 79 and the Township border with Aberdeen has been replaced, including new valves, fire hydrants and customer service lines. The replacement of this critical infrastructure will provide for continued reliable service to all customers in the surrounding area, including several schools.
Monmouth County is schedule to perform a full width road resurfacing of Lloyd Road from Route 79 to the Aberdeen Township border in the Spring/Summer of 2024.
UPCOMING – FUNDED IN PART BY NJDOT GRANT
Ryan Road – The Ryan Road program bid has been awarded and was authorized by the Township Council on October 19. The project scope includes roadway resurfacing, reconstruction of drainage structures and other associated work in a 1.3 mile stretch of Ryan Road from Robertsville Road to State Highway 79. The contract has been awarded to Earle Asphalt Company in the amount of $959,013, offset by a $251,900 NJDOT grant secured by the Township. Work is scheduled to begin this fall, and notifications concerning access to the roadway and detours will be publicized 48 hours in advance.
The scheduled time frame for roadwork is weather-dependent, and every effort will be made to minimize any inconvenience to residents during this time. Please call Marlboro Traffic and Safety at 732-536-0304 with further inquiries.